252-piece Abstract Geometric Vintage Art wooden jigsaw puzzle

Abstract Geometric Vintage Art Wooden Jigsaw Puzzle

Rectangle Puzzle / 11 x 14 in – 252 pieces
Sale price  $39.99 Regular price  $49.99
Skip to product information
252-piece Abstract Geometric Vintage Art wooden jigsaw puzzle
1/10

Abstract Geometric Vintage Art Wooden Jigsaw Puzzle

Sale price  $39.99 Regular price  $49.99
ProductRectangle Puzzle
Size

Turn quiet time into a rewarding creative escape with the Abstract Geometric Vintage Art Wooden Jigsaw Puzzle, featuring a bold vintage-inspired geometric composition with sweeping black forms and colourful accents. The richly detailed artwork makes every section engaging to assemble and transforms the finished puzzle into a display-worthy scene.

Designed for Relaxing, Screen-Free Fun

The distinctive abstract geometric vintage art artwork offers varied colours, shapes and fine details that keep the experience interesting from the first piece to the last. It is an inviting choice for solo puzzling, family game nights or a thoughtful gift for an art and puzzle lover.

Crafted from approximately 3 mm thick pinewood with a smooth wood veneer finish, this puzzle has a sturdy, satisfying feel. Precision laser cutting creates cleanly shaped pieces, while vibrant UV printing highlights the artwork with crisp detail and lasting colour.

Product Features

  • Distinctive artwork: A bold vintage-inspired geometric composition with sweeping black forms and colourful accents.
  • Premium wooden construction: Approximately 3 mm thick pinewood with a smooth wood veneer finish.
  • Precision laser-cut pieces: Clean shapes provide a satisfying assembly experience.
  • Vibrant UV printing: Crisp lines and rich colours showcase the artwork clearly.
  • Three challenge levels: Choose 252, 300 or 504 pieces.
  • Made to order: Produced especially for your order to help avoid unnecessary overproduction.
  • Free US shipping: Complimentary standard shipping within the United States.

Choose Your Puzzle Size

  • 11 x 14 in – 252 pieces: A manageable option for casual puzzlers and shorter sessions.
  • 12 x 18 in – 300 pieces: A balanced challenge for regular puzzle enthusiasts.
  • 14 x 20 in – 504 pieces: A more detailed challenge for experienced puzzlers.

Enjoy the abstract geometric vintage art design as a relaxing project or share it with someone who loves distinctive art. Choose your preferred piece count and make your next puzzle session memorable.

You may also like