Black Southwestern Quilted Bedspread Set – Geometric Sunburst Pattern
Bring bold pattern and warm color into your bedroom with this black Southwestern quilted bedspread set. Against a charcoal-black background, orange, ochre, cream and muted green geometric sunbursts create striking Southwestern bedding with a modern boho influence.
This lightweight geometric bedding set adds color and texture without the bulk of a traditional filled comforter. Two coordinated pillowcases complete the boho bedspread set, making it an easy update for a primary bedroom, guest room or other thoughtfully styled space.
Design Details: The bold black background makes the orange geometric sunbursts stand out while coordinating easily with rustic, eclectic, Southwestern and bohemian bedroom décor. Choose your preferred size and edge finish to create a distinctive bedroom focal point.
Made to Order: This quilted bedding set is produced especially for your order. Slight color variations may occur because of screen settings and the printing process.
Finish Note: White Binding has a separately applied white fabric border, while Fold Hem uses the printed quilt fabric folded and stitched around the edge.
What’s Included
- 1 quilted bedspread
- 2 matching pillowcases with every size
- Each pillowcase measures 20 × 30 inches
- Pillowcases have envelope closures
Material and Construction
- 100% polyester
- Soft and lightweight for year-round use
- Diamond quilting pattern
- Design printed on one side
Size, Contents and Finish Availability
| Bedspread Size | Reference Bed Shown | Pillowcases | White Binding | Fold Hem |
|---|---|---|---|---|
| 55 × 60 inches | Twin / Throw | 2 | Available | Available |
| 60 × 70 inches | Full | 2 | Available | Available |
| 70 × 80 inches | Queen | 2 | Available | Available |
| 80 × 90 inches | King | 2 | Available | Available |
| 90 × 100 inches | California King | 2 | Available | Not Available |
The bed references above are visual guides only. Please compare the listed product measurements with your mattress dimensions and preferred amount of overhang before ordering.
Care Instructions: Machine wash on a gentle cycle with cold water. Sun dry or tumble dry on low.