Set of two Crimson Woods skeleton Halloween door banners

Skeletons in Crimson Woods Halloween Door Banners | Scary Door Decor

180x30 cm (70.8 × 11.8 in)
Sale price  $29.99 Regular price  $37.49
Skip to product information
Set of two Crimson Woods skeleton Halloween door banners

Skeletons in Crimson Woods Halloween Door Banners | Scary Door Decor

Sale price  $29.99 Regular price  $37.49
size

Turn your entrance into a sinister haunted forest with the Skeletons in Crimson Woods Halloween Door Banners. Skeletal figures emerge among twisted trees beneath an intense crimson-red glow, creating an eerie woodland scene that looks as though something has followed you home from the woods.

Made for Halloween displays that are dark, dramatic and genuinely unsettling, this coordinated set of two vertical banners combines striking skeleton Halloween decor with a haunted-forest atmosphere. Hang them beside your front door, porch entrance, party doorway or interior wall to give guests and trick-or-treaters a chilling welcome.

Why You'll Love Them

  • Set of 2 Coordinated Banners: Designed to hang together on either side of a doorway or entrance for a dramatic framed display.

  • Large Vertical Size: Each banner measures approximately 70.8 × 11.8 inches (180 × 30 cm) for an eye-catching Halloween entrance.

  • Indoor & Outdoor Use: Made from lightweight, durable water-resistant nylon fabric, suitable for porches, entryways and indoor spaces.

  • Detailed Sublimation Print: High-definition printing brings out the skeletal figures, twisted trees and vivid crimson tones of the haunted-forest artwork.

  • Easy to Hang: Each banner includes a wooden hanging lever with string at the top for simple installation.

  • Bottom Grommets: Two grommets at the lower corners help keep each banner securely positioned.

  • Reusable Halloween Decor: Store the pair after the season and bring your Crimson Woods display back for future Halloweens.

  • Single-Sided Printing: Artwork is printed on one side of each banner.

Product Details

Material: Nylon fabric
Quantity: Set of 2 banners
Size: 70.8 × 11.8 in / 180 × 30 cm each
Print: One-sided sublimation print
Use: Indoor and outdoor
Water resistance: Water-resistant
Hanging: Wooden hanging lever with string
Bottom fastening: 2 grommets per banner

Invite the darkness of the Crimson Woods to your doorstep and turn an ordinary entrance into a sinister Halloween scene. Framing a front door, porch or haunted-house entrance, these skeletal banners create a striking welcome for trick-or-treaters and anyone brave enough to approach.

You may also like